In short
A good event RFP states the objective and the audience, the dates and how flexible they are, the scope being tendered, a realistic budget range, the evaluation criteria and their weightings, the commercial model you want quoted, and a decision timeline. Share the budget. Invite three or four agencies, not eight. Require a standard cost template so the proposals can be compared line by line rather than on presentation quality.
Key takeaways
- State the objective, not just the logistics — agencies cannot solve a problem you have not described
- Share the budget range; withholding it produces proposals you cannot compare
- Three or four agencies is the right number. Eight wastes everyone's time including yours
- Mandate a standard cost template or you will be comparing presentation skill, not value
Why most event RFPs produce proposals you cannot compare
The typical event brief describes an event: 300 people, two nights, Goa, November, conference plus gala dinner. Four agencies receive it and return four documents that are impossible to compare, because each has made different assumptions about hotel category, production scale, what is included and what is not.
One has quoted a five-star beach resort with a built set. Another has quoted a four-star property with venue-supplied AV. The cheapest proposal is not the best value and the most expensive is not the most ambitious — they are simply answering different questions. The buyer then compares the numbers anyway, because the numbers are the only comparable thing on the page.
The fix is not a longer brief. It is a brief that fixes the variables that matter and a mandated cost template that forces every respondent to price the same thing.
What to put in the brief
Eight sections cover almost every corporate event tender. Two or three pages is plenty; the quality is in the specificity, not the length.
1. Objective and audience
One paragraph on what the event is for and what should be different afterwards, and one on who is attending — seniority, internal or external, domestic or international, age profile, and anything that changes the design such as family attendance or regional language needs. This is the section most briefs omit and the one that most improves the responses.
2. Dates, duration and flexibility
Give the preferred dates and say honestly how movable they are. Date flexibility is the single most valuable negotiating asset an agency has on your behalf, and an agency that knows you could move a fortnight will come back with options you would not otherwise see.
3. Numbers and the room
Expected headcount with a likely range, the seating style for each session, how many breakouts, whether the event is residential, and the room-night pattern. Say what the variance might be — an agency contracting for 300 when you may be 220 needs to build that into the attrition negotiation.
4. Scope being tendered
List explicitly what you want the agency to deliver and what you are keeping in-house. Ambiguity here is the main source of later disputes.
- Venue sourcing, negotiation and contracting
- Accommodation and room block management
- Production: set, staging, lighting, sound, LED, show calling
- Content support, speaker sourcing, scripting
- Registration platform, badging and on-site check-in
- Travel, transfers and ground logistics
- Food and beverage design and menu tastings
- Gifting, signage and printed or digital collateral
- On-site staffing, run of show and show management
- Post-event reconciliation, feedback and wrap report
5. Budget
State a range. Withholding the budget is the single most counterproductive habit in event procurement — it does not reveal who is cheapest, it only guarantees that the proposals you receive are priced against four different imagined events. Share a range, say whether it is inclusive of tax, and state whether it is a ceiling or a target.
6. Commercial model
Say how you want to be charged: percentage of managed spend, flat project fee, or open-book cost-plus. Require taxes shown separately per line, and require the response to state explicitly what is excluded. If you want any supplier commissions disclosed, say so here. We discuss the models in in-house planning versus an event management company.
7. Evaluation criteria and weightings
Publish how you will score. Doing so improves the responses, because agencies invest effort where it counts, and it protects your own process from a late argument about why the shortlist looks the way it does.
8. Process and timeline
Submission deadline, question window and how questions will be answered, pitch dates, decision date, and who the single point of contact is. Agencies are planning their own resourcing against your dates; vagueness here costs you the attention of the good ones.
Mandate a cost template
This is the highest-return instruction in the whole document. Attach a simple spreadsheet with fixed line items — venue hire, accommodation by room night, food and beverage per service, production by element, travel, transfers, registration, staffing, agency fee, taxes — and require every respondent to complete it in addition to whatever creative document they wish to submit.
Three things immediately become visible. Where one agency is significantly cheaper and why. What each has assumed about hotel category and production scale. And what has been excluded — which is usually the real difference between two proposals that look similar in total.
Also require a stated assumptions section. Any honest proposal has assumptions; the useful question is whether the agency is willing to write them down.
If every proposal arrives in a different format, you are not evaluating value. You are evaluating graphic design.
How many agencies to invite
Three or four. Fewer gives you no comparison and no leverage. More consumes your own team disproportionately — reading eight proposals properly and running eight pitch meetings is a week of work — and reduces each agency's win probability to the point where the good ones decline or submit something generic.
If you have a long list, run a short qualification round first: a one-page request covering relevant experience at your scale, on-ground presence in the destination city, named team, insurance and references. Shortlist from that, then issue the full brief only to the three or four who survive.
Tell everyone how many are competing. It is a small courtesy that measurably improves the effort you receive.
Scoring the responses
Weight the criteria before the proposals arrive, so the scoring is not reverse-engineered around a favourite. A workable default for a mid-sized corporate event:
- Understanding of the objective and the quality of the proposed approach — 30%
- Relevant experience at comparable scale, with contactable references — 20%
- The team actually assigned, and on-ground presence in the destination — 15%
- Total cost and value for money against the template — 25%
- Commercial terms, transparency and risk handling — 10%
Check references properly
Ask for three clients with events of similar size and format, and actually call them. Two questions produce more than any written case study: what went wrong, and how did the agency handle it? An agency whose references cannot recall anything going wrong either has very new references or has not run enough events.
The pitch meeting
Insist that the people who will actually run your event are in the room. The commonest frustration in agency relationships is meeting an impressive senior team at the pitch and working with someone else entirely from week two. Ask directly: who is my day-to-day contact, who is on site, and what else are they working on during my event period?
Give every agency the same time and the same format, and keep a quarter of it for your questions rather than their presentation. Useful ones: what is the biggest risk in this brief; what would you change about what we have asked for; what would you do if the budget were cut by 20%; what happens if the venue cancels six weeks out. The answers separate experience from polish quickly.
Red flags
Certain responses reliably predict trouble later.
- A lump-sum price with no line items, or refusal to complete your cost template
- No stated assumptions and no exclusions listed
- A quote materially below everyone else with no explanation of how
- No named on-site lead, or a team described only by job title
- No offer of a site inspection for an unfamiliar venue
- Vague cancellation, force majeure or payment terms
- Reluctance to explain how the agency is paid, or to disclose supplier commissions when asked
- References that cannot be contacted, or case studies with no client named even confidentially
After you appoint
Debrief the unsuccessful agencies honestly and briefly. It costs twenty minutes, it is the professional thing to do, and it means they will bid properly next time — which is worth more to you than to them.
With the winner, convert the proposal into a contract that names the scope, the cost template as agreed, the change-control process, the payment milestones, the named team and the cancellation terms. Then hold one kickoff meeting that re-states the objective and the success measures, because the brief that won the pitch has a way of being forgotten once logistics begin.
If you would like us to respond to a brief, our event management team quotes against your template and shows taxes separately as standard — and if you do not have a template yet, ask and we will send one.
RFP section checklist
| Section | What to state | Why it matters |
|---|---|---|
| Objective | What should be different after the event | Lets agencies propose an approach, not just a quote |
| Audience | Seniority, origin, language, family attendance | Drives destination, content and hospitality design |
| Dates | Preferred dates and how flexible they are | Date flexibility is the strongest negotiating lever |
| Numbers | Headcount range, seating styles, room nights | Determines venue fit and attrition exposure |
| Scope | What is tendered and what stays in-house | The main source of later disputes if left vague |
| Budget | A stated range, tax position, ceiling or target | Without it, proposals price four different events |
| Commercials | Fee model, tax shown per line, exclusions stated | Makes proposals genuinely comparable |
| Evaluation | Criteria and weightings, published upfront | Improves responses and protects your process |
| Timeline | Questions, submission, pitch, decision dates | Good agencies resource against your dates |
Planning something like this?
Tell us the brief, get an itemised proposal
Share your dates, group size and destination. You will get a costed, line-by-line proposal from our planning team within 24 hours — with taxes shown separately.
Frequently asked questions
Yes. Withholding the budget does not reveal who is cheapest; it guarantees that each agency prices a different imagined event, which makes the proposals impossible to compare. Share a range, state whether it includes tax, and say whether it is a ceiling or a target.



